News:

Buffalo provides Data Recovery services. Read about it here.

Main Menu

LS-CHL 1TB power management

Started by montr, May 13, 2009, 09:20:19 AM

Previous topic - Next topic

montr

   

I have firmware 1.07. The NAS is powering up and down correctly when the PCs are running and sending that keep alive magic packet. However, when I tried to set a schedule for powering up and down the NAS (in maintenace tab in the NAS web interface), it did not seems to work.

 

When I set a schedule for powering up and down the NAS, what position should I set the power switch in the back? Can I have it both way, I mean that I can set a schedule for the power and I can also wake it up from the PC?

 

Thanks


Browser ID: smf (is_webkit)
Templates: 4: index (default), Display (default), GenericControls (default), GenericControls (default).
Sub templates: 6: init, html_above, body_above, main, body_below, html_below.
Language files: 5: index+Modifications.english (default), Post.english (default), Editor.english (default), Drafts.english (default), StopForumSpam.english (default).
Style sheets: 4: index.css, attachments.css, jquery.sceditor.css, responsive.css.
Hooks called: 108 (show)
Files included: 35 - 1354KB. (show)
Memory used: 932KB.
Tokens: post-login.
Queries used: 16.

[Show Queries]