Buffalo Forums

Products => Storage => Topic started by: bardes on November 03, 2009, 05:28:21 AM

Title: TeraStaion Pro
Post by: bardes on November 03, 2009, 05:28:21 AM
   

Jus got a new TeraStaion Pro II ( TS-HTGL/R5 F/W 1.33) that I use as a fileserver. It backs up on 2 USB disks.

The problem is it will not start a sceduled backup.

 

I have defined 2 backup jobs, 1 for each backupdisc.Job1 (USB disc1) starts 30 minutes before job2(USB disc2). The jobs are configured to "Ignore Errors and Proceed with Future Backups"  

 

I only connnect 1 of the two usb discs at atime.

 

When I run  a job "imedeately" it runs , produses a logfile and sends me a mail.

The sceduled jobs produses no logfile and no mail

 

Why does this not work?

 

And, a question:

Can these USB drives containing backup be read /restored by a windows pc in some way?

 

Regards

Bard

 

 

Title: Re: TeraStaion Pro
Post by: Kameran on November 03, 2009, 10:38:59 AM

With any backups to a usb hd you need to first format it to xfs through the gui of the buffalo.   Once you do that it should become a simple target for a backup job.  To read the data on there you need a linux box. or a windows program like "xfs or ufs exploree" (third party softare not supported or recommended by the buffalo.)  XFS is not a file system that windows will recognize natively.

Title: Re: TeraStation Pro
Post by: bardes on November 04, 2009, 07:10:15 AM
   

Hi

It is backing up to usb disc when a job starts as "immediately", but not "scheduled". Will a scheduled job handle the disc different than a job that starts immediately?

Bard

Browser ID: smf (is_webkit)
Templates: 1: Printpage (default).
Sub templates: 4: init, print_above, main, print_below.
Language files: 1: index+Modifications.english (default).
Style sheets: 0: .
Hooks called: 59 (show)
Files included: 27 - 1055KB. (show)
Memory used: 719KB.
Tokens: post-login.
Queries used: 14.

[Show Queries]