Author Topic: LS-CHL 1TB power management  (Read 1005 times)

montr

  • Calf
  • *
  • Posts: 4
LS-CHL 1TB power management
« on: May 13, 2009, 09:20:19 am »
   

I have firmware 1.07. The NAS is powering up and down correctly when the PCs are running and sending that keep alive magic packet. However, when I tried to set a schedule for powering up and down the NAS (in maintenace tab in the NAS web interface), it did not seems to work.

 

When I set a schedule for powering up and down the NAS, what position should I set the power switch in the back? Can I have it both way, I mean that I can set a schedule for the power and I can also wake it up from the PC?

 

Thanks