I have firmware 1.07. The NAS is powering up and down correctly when the PCs are running and sending that keep alive magic packet. However, when I tried to set a schedule for powering up and down the NAS (in maintenace tab in the NAS web interface), it did not seems to work.
When I set a schedule for powering up and down the NAS, what position should I set the power switch in the back? Can I have it both way, I mean that I can set a schedule for the power and I can also wake it up from the PC?
Thanks